Skip to content
News

Takanawa Gateway Project Progress Report

Takanawa Gateway Project Progress Report

This is a project within "TAKANAWA GATEWAY CITY," for which our company is responsible for overall design and supervision, following a design-build competition.
Construction is progressing smoothly, and the ridge-raising ceremony will take place soon.

The location is directly in front of the newly opened MoN Takanawa.
Still covered in protective sheets, its full appearance is not yet visible.

The exterior, with its washed-concrete finish, resembles a stratum uplifted from the seabed.
The building attempts to embody the memory of this land, once a part of the ocean.

高輪ゲートウェイ 洗い出しの柱


Related Articles

Read more

国内最大級!4.2mの木製フルオープンサッシ
Weekly Projects

国内最大級!4.2mの木製フルオープンサッシ

天井高4.2mの無柱リビングを1階に配置。庭側の木製サッシを全開放することで、内外が一体となる開放的な空間を生み出しています。

Read more